GUAVA PULP · PUREE · BEVERAGE BASEsales@guavaprocessingline.com

GUAVA / EQUIPMENT & ENGINEERING

Guava Processing Flow and Equipment Connections

Follow fruit preparation, pulping/refining, buffering and treatment, with separate equipment routes for supplied pulp and beverage base.

01

Follow the stream, including what leaves it

Washing dirt, inspection rejects and pulper residue leave through different collection paths. They belong in the arrangement alongside the accepted product. Keep direct operator access to the preparation stages and space to inspect and service the pulper.

02

Choose the entry point

Whole fruit starts upstream of extraction. An existing pulp supply begins at a defined receiving and transfer point. Beverage-base processing adds a recipe boundary. These choices determine which equipment is needed and which duties remain with an upstream plant.

WHOLE FRUIT → BULK PULP

Guava Pulp and Puree Processing Line

  1. 01

    Wash and inspect

    Select brush washing or a bath-and-elevator configuration for fruit condition. Manual inspection removes unsuitable fruit before preparation.

  2. 02

    Prepare the feedConfiguration option

    Choose the direct, reduced-size or conditioned feed route from a representative trial. Guava seed integrity is assessed when changing preparation.

  3. 03

    Extract and refine

    One double-stage assembly combines primary pulping and further refinement. Keep pulp and residue paths accessible for sampling and removal.

  4. 04

    Buffer and condition

    Balance extraction against the continuous treatment demand. Vacuum deaeration is an option where the product duty calls for air removal.

  5. 05

    Treat and fill

    Coordinate heating, holding and cooling with the chosen bag fitment and filling condition. Cleaning routes connect the selected closed circuits.

View this complete route →

EXISTING PULP → FILLED BAG

Guava Pulp Treatment and Filling

  1. 01

    Receive and buffer

    Identify the supply container, transfer method and product condition. A practical working buffer connects batch receiving to the next continuous module.

  2. 02

    Manage air where neededConfiguration option

    Assess aeration and feed behaviour before including a vacuum stage. Keep the outlet transfer closed and compatible with the thermal system.

  3. 03

    Apply the selected treatment

    Match product passage, flow control, holding and cooling to the pulp and preservation process. Allow for startup, stops and changeover.

  4. 04

    Fill and clean the product route

    Coordinate fitment, fill quantity, bag handling and sterile interfaces; route cleaning to all selected closed paths.

View this complete route →

PULP + RECIPE → TREATED BASE

Guava Beverage Base Processing

  1. 01

    Receive the pulp

    Use a buffer arrangement compatible with the supplied pulp, transfer conditions and planned batch sequence.

  2. 02

    Blend the recipe

    Measure pulp and additions into the selected blending configuration. Establish the mixing task and ingredient sequence.

  3. 03

    Condition the baseConfiguration option

    High-pressure homogenization or vacuum deaeration may be included where the recipe and product trials justify them.

  4. 04

    Treat and hand over

    Coordinate thermal duty with bulk bag filling where selected, or a defined interface to a separate final packaging line. Include cleaning paths between recipes.

View this complete route →

LET’S DEFINE YOUR EQUIPMENT SCOPE

What are you planning
to process?

Share your fruit or pulp, target product and planned quantity. We can start with a short brief.

Request an equipment quotation ↗Or email sales@guavaprocessingline.com
View machinesRequest a quote ↗